EV charging stations in Brackenheim
24 public charging sites with 47 charge points are registered in Brackenheim, including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 150 kW.
The largest operator is eze.network GmbH with 16 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Hermann-Bauer-Straße 10, 74336 BrackenheimDirections
- Maulbronner Straße 14, 74336 BrackenheimDirections
- Neipperger Straße 31, 74336 BrackenheimDirections
- Georg-Kohl-Straße 47, 74336 BrackenheimDirections
- Frankenbacher Str. 6, 74336 BrackenheimDirections
Other charging sites
AC charge points, sorted by number of points.
- Georg-Kohl-Str. 40, 74336 BrackenheimDirections
- Marktplatz 1, 74336 BrackenheimDirections
- Hermann-Bauer-Str. 2, 74336 BrackenheimDirections
- Theodor-Heuss-Str. 2, 74336 BrackenheimDirections
- Rosengasse 9, 74336 BrackenheimDirections
- Vollmerstr. 17, 74336 BrackenheimDirections
- Hirnerweg 19, 74336 BrackenheimDirections
- Austr. 41, 74336 BrackenheimDirections
- Heilbronner Str. 41, 74336 BrackenheimDirections
- Nordhausener Str. 48, 74336 BrackenheimDirections
- Marktplatz 1, 74336 BrackenheimDirections
- Hindenburgstr. 4, 74336 BrackenheimDirections
- Meimsheimer Str 17, 74336 BrackenheimDirections
- Eichendorffweg 7, 74336 BrackenheimDirections
Recently opened
- 11 Aug 2026 · Georg-Kohl-Str. 40 · 22 kW · VBU Volksbank im Unterland eG
- 20 Feb 2026 · Theodor-Heuss-Str. 2 · 22 kW · eze.network GmbH
- 25 Sept 2025 · Hirnerweg 19 · 22 kW · eze.network GmbH
- 19 May 2025 · Nordhausener Str. 48 · 22 kW · eze.network GmbH
- 1 May 2025 · Heilbronner Str. 41 · 22 kW · eze.network GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Neckarsulm 367
- Abstatt 147
- Bad Rappenau 70
- Ilsfeld 62
- Neuenstadt am Kocher 58
- Untergruppenbach 58
- Weinsberg 42
- Leingarten 27
Data: official national charge point register (1 September 2026). Data sources