Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Heilbronn · Baden-Württemberg · Germany

EV charging stations in Neckarsulm

207 public charging sites with 367 charge points are registered in Neckarsulm, including 39 DC fast-charging points and 37 delivering at least 150 kW. The most powerful points deliver up to 360 kW.

The largest operator is AUDI AG with 300 charge points; 14 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites207
Charge points367
DC fast points39
150 kW and up37

Charge points by power

≤ 11 kW6
12–22 kW53
23–49 kW0
50–149 kW2
≥ 150 kW306

Operators

AUDI AG300
Pfalzwerke AG14
Aral Pulse12
SMATRICS GmbH & Co KG10
EnBW mobility+ AG und Co.KG6
Shell Deutschland GmbH4
Neff4
EnBW ODR AG4
CUBOS Service GmbH4
Lidl2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Kanalstraße 1, 74172 Neckarsulm
    Shell Deutschland GmbH360 kW4 pointsCCS
    Directions
  • NSU-Str. 0, 74172 Neckarsulm
    AUDI AG300 kW272 pointsCCS, Type 224/7
    Directions
  • Neuenstädter Strasse 96, 74172 Neckarsulm
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Neuenstädter Str. 96, 74172 Neckarsulm
    Aral Pulse300 kW4 pointsCCS
    Directions
  • Siegmund-Loewe-Straße 0, 74172 Neckarsulm
    Pfalzwerke AG160 kW11 pointsCCS, Type 2
    Directions
  • Deutschordensplatz 2, 74172 Neckarsulm
    Pfalzwerke AG160 kW3 pointsCCS
    Directions
  • Stuttgarter Straße 34, 74172 Neckarsulm
    SMATRICS GmbH & Co KG150 kW4 pointsCCS, Type 224/7
    Directions
  • Neuenstädter Strasse 93, 74172 Neckarsulm
    Aral Pulse150 kW4 pointsCCS
    Directions
  • Urbanstr. 11, 74172 Neckarsulm
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Rötelstr. 35, 74172 Neckarsulm
    Kaufland22 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hafenstr. 0, 74172 Neckarsulm
    AUDI AG22 kW26 pointsType 224/7
    Directions
  • Odenwaldstraße 1, 74172 Neckarsulm
    SMATRICS GmbH & Co KG22 kW4 pointsType 2
    Directions
  • Im Klauenfuß 6, 74172 Neckarsulm
    Neff22 kW4 pointsType 2
    Directions
  • Pichterichstr. 25, 74172 Neckarsulm
    EnBW ODR AG22 kW4 pointsType 2
    Directions
  • Sulmstr. 2, 74172 Neckarsulm
    CUBOS Service GmbH11 kW4 pointsType 224/7
    Directions
  • Hohenloherstraße 2, 74166 Neckarsulm
    Lidl22 kW2 pointsType 2
    Directions
  • Ratsgasse 0, 74172 Neckarsulm
    SMATRICS GmbH & Co KG22 kW2 pointsType 2
    Directions
  • Bahnhofplatz 1, 74172 Neckarsulm
    EnBW mobility+ AG und Co.KG22 kW2 pointsType 2
    Directions
  • Carl-Zeiss-Str. 1, 74172 Neckarsulm
    AUDI AG22 kW2 pointsType 224/7
    Directions
  • Marktstraße 18, 74172 Neckarsulm
    ZEAG Energie AG22 kW2 pointsType 2
    Directions
  • Urbanstrasse 15-19, 74172 Neckarsulm
    EnBW mobility+ AG und Co.KG22 kW2 pointsType 2
    Directions
  • Im Grund 8, 74172 Neckarsulm
    Hausverwaltung WEG11 kW2 pointsType 2
    Directions
  • Gartenstraße 0, 74172 Neckarsulm
    Franz Maul, Einzelunternehmen22 kW1 pointsType 2
    Directions

Recently opened

  • 10 Aug 2026 · Carl-Zeiss-Str. 1 · 22 kW · AUDI AG
  • 29 Oct 2024 · Pichterichstr. 25 · 22 kW · EnBW ODR AG
  • 6 May 2024 · Sulmstr. 2 · 11 kW · CUBOS Service GmbH
  • 2 May 2024 · Stuttgarter Straße 34 · 150 kW · SMATRICS GmbH & Co KG
  • 14 Mar 2024 · Neuenstädter Str. 96 · 300 kW · Aral Pulse

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out