Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Heilbronn · Baden-Württemberg · Germany

EV charging stations in Weinsberg

19 public charging sites with 42 charge points are registered in Weinsberg, including 5 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is smopi with 26 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites19
Charge points42
DC fast points5
150 kW and up4

Charge points by power

≤ 11 kW1
12–22 kW35
23–49 kW0
50–149 kW2
≥ 150 kW4

Operators

smopi26
Vollert6
EnBW mobility+ AG und Co.KG4
deer GmbH3
Kaufland2
Viktor Seder1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Am Autobahnkreuz 9-13, 74189 Weinsberg
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Haller Str. 59, 74189 Weinsberg
    Kaufland50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Kernerstraße 13, 74189 Weinsberg
    smopi22 kW10 pointsType 2
    Directions
  • Stadtseestraße 12, 74189 Weinsberg
    Vollert22 kW6 pointsType 2
    Directions
  • Grasiger Hag 1, 74189 Weinsberg
    smopi22 kW4 pointsType 224/7
    Directions
  • Bahnhofplatz 3, 74189 Weinsberg
    smopi22 kW4 pointsType 224/7
    Directions
  • Rossäckerstr. 11, 74189 Weinsberg
    smopi22 kW4 pointsType 224/7
    Directions
  • Rossäckerstr. 46, 74189 Weinsberg
    smopi22 kW4 pointsType 224/7
    Directions
  • Bandhausgasse 5, 74189 Weinsberg
    deer GmbH22 kW3 pointsType 224/7
    Directions
  • Lerchenstraße 15, 74189 Weinsberg
    Viktor Seder7 kW1 pointsType 2
    Directions

Recently opened

  • 12 Dec 2025 · Bahnhofplatz 3 · 22 kW · smopi
  • 4 Nov 2025 · Rossäckerstr. 46 · 22 kW · smopi
  • 24 Jun 2025 · Grasiger Hag 1 · 22 kW · smopi
  • 29 Apr 2025 · Rossäckerstr. 11 · 22 kW · smopi
  • 14 Aug 2024 · Bandhausgasse 5 · 22 kW · deer GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET