EV charging stations in Neuenstadt am Kocher
22 public charging sites with 58 charge points are registered in Neuenstadt am Kocher, including 6 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is smopi with 22 charge points; 7 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Daimlerstraße 8, 74196 Neuenstadt am KocherDirections
- Daimlerstraße 8, 74197 Neuenstadt am KocherDirections
- Daimlerstraße 8, 74198 Neuenstadt am KocherDirections
Other charging sites
AC charge points, sorted by number of points.
- Wilhelm-Maybach-Straße 2, 74196 Neuenstadt am KocherDirections
- Bahnweg 3, 74196 Neuenstadt am KocherDirections
- Bahnweg 3, 74196 Neuenstadt am KocherDirections
- Lindenplatz 2, 74196 Neuenstadt am KocherDirections
- Wilhelm-Meybach-Straße 2, 74196 Neuenstadt am KocherDirections
- Lindenplatz 2, 74196 Neuenstadt am KocherDirections
- Wilhelm-Meybach-Straße 2, 74196 Neuenstadt am KocherDirections
- Marienstraße 8, 74196 Neuenstadt am KocherDirections
- Cleversulzbacher Str. 9, 74196 Neuenstadt am KocherDirections
- Kirchstraße 16, 74196 Neuenstadt am KocherDirections
- Kirchstraße 16, 74196 Neuenstadt am KocherDirections
- Hauptstraße 50, 74196 Neuenstadt am KocherDirections
- Hauptstraße 50, 74196 Neuenstadt am KocherDirections
- Lindenplatz 2, 74198 Neuenstadt am KocherDirections
Recently opened
- 4 May 2026 · Cleversulzbacher Str. 9 · 22 kW · deer GmbH
- 22 May 2025 · Marienstraße 8 · 22 kW · Wirelane GmbH
- 23 Apr 2024 · Wilhelm-Maybach-Straße 2 · 22 kW · smopi
- 28 Jul 2022 · Daimlerstraße 8 · 150 kW · EnBW ODR AG
- 20 Jul 2022 · Daimlerstraße 8 · 300 kW · EnBW ODR AG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Neckarsulm 367
- Abstatt 147
- Bad Rappenau 70
- Ilsfeld 62
- Untergruppenbach 58
- Brackenheim 47
- Weinsberg 42
- Leingarten 27
Data: official national charge point register (1 September 2026). Data sources