Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Main-Kinzig-Kreis · Hessen · Germany

EV charging stations in Bruchköbel

24 public charging sites with 33 charge points are registered in Bruchköbel, including 9 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 184 kW.

The largest operator is Demuth Kühlhaussysteme GmbH with 6 charge points; 12 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites24
Charge points33
DC fast points9
150 kW and up8

Charge points by power

≤ 11 kW10
12–22 kW11
23–49 kW0
50–149 kW2
≥ 150 kW10

Operators

Demuth Kühlhaussysteme GmbH6
EAM Natur Energie GmbH6
Circle K Deutschland4
Versorgungsservice Main-Kinzig GmbH4
Netto Marken-Discount Stiftung & Co. KG2
Lidl2
ALDI SÜD2
Sparkasse Hanau Anstalt des Öffentlichen Rechts2
Jacek Haußner2
Thorsten Graupe1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Philipp-Reis-Straße 9, 63486 Bruchköbel
    Demuth Kühlhaussysteme GmbH184 kW6 pointsCCS, Type 2
    Directions
  • Römerstr. 16, 63486 Bruchköbel
    Circle K Deutschland175 kW4 pointsCCS, CHAdeMO
    Directions
  • Bahnhofstr. 29, 63486 Bruchköbel
    Netto Marken-Discount Stiftung & Co. KG50 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hauptstraße 32, 63486 Bruchköbel
    EAM Natur Energie GmbH11 kW6 pointsType 2
    Directions
  • Keltenstraße 2-6, 06346 Bruchköbel
    Lidl22 kW2 pointsType 2
    Directions
  • Hanauer Str. 0, 63486 Bruchköbel
    Versorgungsservice Main-Kinzig GmbH22 kW2 pointsType 224/7
    Directions
  • Römerstraße 3, 63486 Bruchköbel
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Geschwister-Scholl-Str. 5, 63486 Bruchköbel
    Versorgungsservice Main-Kinzig GmbH22 kW2 pointsType 224/7
    Directions
  • Hauptstr. 51, 63486 Bruchköbel
    Sparkasse Hanau Anstalt des Öffentlichen Rechts22 kW2 pointsType 2
    Directions
  • Savignyring 4, 63486 Bruchköbel
    Jacek Haußner11 kW2 pointsType 2
    Directions
  • Breslauer Str. 4, 63486 Bruchköbel
    Thorsten Graupe22 kW1 pointsType 2
    Directions
  • Bahnhofstr. 4-6, 63486 Bruchköbel
    Frankfurter Volksbank eG11 kW1 pointsType 2
    Directions
  • Savignyring 3b, 63486 Bruchköbel
    Marcus Spahn11 kW1 pointsType 2
    Directions

Recently opened

  • 12 Apr 2024 · Hanauer Str. 0 · 22 kW · Versorgungsservice Main-Kinzig GmbH
  • 12 Apr 2024 · Geschwister-Scholl-Str. 5 · 22 kW · Versorgungsservice Main-Kinzig GmbH
  • 13 Feb 2024 · Römerstr. 16 · 175 kW · Circle K Deutschland
  • 1 Jan 2024 · Breslauer Str. 4 · 22 kW · Thorsten Graupe
  • 12 Dec 2023 · Bahnhofstr. 29 · 50 kW · Netto Marken-Discount Stiftung & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET