EV charging stations in Maintal
43 public charging sites with 81 charge points are registered in Maintal, including 31 DC fast-charging points and 28 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Maintal-Werke GmbH with 32 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Braubachstraße 18, 63477 MaintalDirections
- Industriestr. 6, 63477 MaintalDirections
- Am Kreuzstein 75, 63477 MaintalDirections
- Edmund-Seng-Str. 17, 63477 MaintalDirections
- Berliner Str. 64, 63477 MaintalDirections
- Sandgasse 4, 63477 MaintalDirections
- Bruno-Dreßler-Straße 1, 63477 MaintalDirections
- Voltastraße 7, 63477 MaintalDirections
Other charging sites
AC charge points, sorted by number of points.
- Herbert Belser Ring 0, 63477 MaintalDirections
- Industriestraße 6, 63477 MaintalDirections
- Hintertor 13, 63477 MaintalDirections
- Zwingerstraße 1, 63477 MaintalDirections
- Raiffeisenstraße 3, 63477 MaintalDirections
- Uferstraße 4, 63477 MaintalDirections
- Am Röderberg 8, 63477 MaintalDirections
- Hauptstraße 9, 63477 MaintalDirections
- Feldbergring 11, 63477 MaintalDirections
- Wilhelm-Röntgen Str. 11, 63477 MaintalDirections
- Wichernstr. 13, 63477 MaintalDirections
- Edmund-Seng-Straße 17, 63477 MaintalDirections
- Dörnigheimer Weg 21, 63477 MaintalDirections
- Rhönstraße 33, 63477 MaintalDirections
- Wilhelmsbader Straße 48, 63477 MaintalDirections
- Kesselstädter Str. 49, 63477 MaintalDirections
- Am Weides 67, 63477 MaintalDirections
- Kennedystraße 78, 63477 MaintalDirections
- Westendstraße 88, 63477 MaintalDirections
- Bahnhofstraße 127-117, 63477 MaintalDirections
- Kennedystraße 78, 63477 MaintalDirections
- Alt-Bischofsheim 13-15, 63477 MaintalDirections
Recently opened
- 15 Jul 2026 · Braubachstraße 18 · 400 kW · EnBW mobility+ AG und Co.KG
- 9 Feb 2026 · Edmund-Seng-Str. 17 · 300 kW · Maintal-Werke GmbH
- 1 Dec 2025 · Wichernstr. 13 · 22 kW · Maintal-Werke GmbH
- 11 Jun 2025 · Sandgasse 4 · 50 kW · Maintal-Werke GmbH
- 10 Dec 2024 · Industriestr. 6 · 300 kW · EnBW mobility+ AG und Co.KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Schlüchtern 91
- Gelnhausen 78
- Bad Soden-Salmünster 68
- Nidderau 51
- Erlensee 44
- Langenselbold 39
- Bruchköbel 33
- Rodenbach 33
- Linsengericht 29
- Wächtersbach 27
Data: official national charge point register (1 September 2026). Data sources