EV charging stations in Rodenbach
17 public charging sites with 33 charge points are registered in Rodenbach, including 14 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Chargemaker GmbH with 14 charge points; 5 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Aueweg 1, 63517 RodenbachDirections
- Adolf-Reichwein-Str. 13, 63517 RodenbachDirections
Other charging sites
AC charge points, sorted by number of points.
- Am Waldstadion 1, 63517 RodenbachDirections
- Alzenauer Str. 2, 63517 RodenbachDirections
- Im Lochseif 5, 63517 RodenbachDirections
- Hanauer Straße 6, 63517 RodenbachDirections
- Erfurter Str. 8, 63517 RodenbachDirections
- Am Dorf 10, 63517 RodenbachDirections
- Hainbornstraße 11, 63517 RodenbachDirections
- Hanauer Landstraße 14, 63517 RodenbachDirections
- Wiesenstraße 17, 63517 RodenbachDirections
- Birkenstraße 8, 63517 RodenbachDirections
Recently opened
- 7 Aug 2025 · Am Aueweg 1 · 300 kW · EnBW mobility+ AG und Co.KG
- 26 Jul 2024 · Adolf-Reichwein-Str. 13 · 300 kW · Greenman Energy Operations GmbH & Co. KG
- 27 Jul 2023 · Im Lochseif 5 · 22 kW · Chargemaker GmbH
- 27 Jul 2023 · Hanauer Straße 6 · 22 kW · Chargemaker GmbH
- 27 Jul 2023 · Hanauer Landstraße 14 · 22 kW · Chargemaker GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Schlüchtern 91
- Maintal 81
- Gelnhausen 78
- Bad Soden-Salmünster 68
- Nidderau 51
- Erlensee 44
- Langenselbold 39
- Bruchköbel 33
- Linsengericht 29
- Wächtersbach 27
Data: official national charge point register (1 September 2026). Data sources