Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ludwigsburg · Baden-Württemberg · Germany

EV charging stations in Freiberg am Neckar

19 public charging sites with 35 charge points are registered in Freiberg am Neckar, including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 14 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites19
Charge points35
DC fast points10
150 kW and up8

Charge points by power

≤ 11 kW3
12–22 kW22
23–49 kW0
50–149 kW2
≥ 150 kW8

Operators

EnBW mobility+ AG und Co.KG14
Shell Deutschland GmbH4
SWLB Mobilität GmbH4
EnBW ODR AG4
smopi3
deer GmbH2
Hotel Schober GbR2
Anna und Stefan Witmaier GbR1
Jens Leisenberg1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Ruitstraße 68, 71691 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Ludwigsburger Str. 93, 71691 Freiberg am Neckar
    Shell Deutschland GmbH300 kW4 pointsCCS
    Directions
  • Bahnhofstr. 7, 71691 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG100 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Benzstr. 10, 71691 Freiberg am Neckar
    smopi22 kW3 pointsType 224/7
    Directions
  • Gründelbachstraße 10, 71687 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Bahnhofstraße 99, 71687 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Kleiststr. 99, 71687 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Württemberger Straße 34-36, 71687 Freiberg am Neckar
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Benninger Str. 0, 71691 Freiberg am Neckar
    SWLB Mobilität GmbH22 kW2 pointsType 224/7
    Directions
  • Porschestraße 5, 71691 Freiberg am Neckar
    deer GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Porschestr. 5, 71691 Freiberg am Neckar
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Benzstr. 11, 71691 Freiberg am Neckar
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Wasenstr. 35, 71691 Freiberg am Neckar
    SWLB Mobilität GmbH22 kW2 pointsType 224/7
    Directions
  • Bahnhofstr. 65, 71691 Freiberg am Neckar
    Hotel Schober GbR11 kW2 pointsType 224/7
    Directions
  • Sophie-Scholl-Straße 5, 71691 Freiberg am Neckar
    Anna und Stefan Witmaier GbR22 kW1 pointsType 2
    Directions
  • Friedenstr. 21, 71691 Freiberg am Neckar
    Jens Leisenberg11 kW1 pointsType 224/7
    Directions

Recently opened

  • 24 Mar 2026 · Ludwigsburger Str. 93 · 300 kW · Shell Deutschland GmbH
  • 10 Sept 2025 · Benzstr. 10 · 22 kW · smopi
  • 21 Aug 2025 · Porschestr. 5 · 22 kW · EnBW ODR AG
  • 13 Feb 2025 · Bahnhofstr. 7 · 100 kW · EnBW mobility+ AG und Co.KG
  • 24 Jun 2024 · Friedenstr. 21 · 11 kW · Jens Leisenberg

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET