Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Ludwigsburg · Baden-Württemberg · Germany

EV charging stations in Gerlingen

38 public charging sites with 88 charge points are registered in Gerlingen, including 2 DC fast-charging points and 1 delivering at least 150 kW. The most powerful points deliver up to 250 kW.

The largest operator is Robert Bosch GmbH with 49 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites38
Charge points88
DC fast points2
150 kW and up1

Charge points by power

≤ 11 kW9
12–22 kW28
23–49 kW0
50–149 kW2
≥ 150 kW49

Operators

Robert Bosch GmbH49
SWS12
EnBW mobility+ AG und Co.KG12
Autohaus Müller GmbH & Co. KG4
EGT Energy Solutions GmbH4
SCHARR Drive Ladestation4
Kaufland2
Kiwon Park1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Robert-Bosch-Platz 1, 70839 Gerlingen
    Robert Bosch GmbH250 kW49 pointsCCS, Type 2
    Directions
  • Weilimdorrferstraße 93 + 95, 70839 Gerlingen
    Kaufland50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Weilimdorfer Str. 88, 70839 Gerlingen
    Autohaus Müller GmbH & Co. KG22 kW4 pointsType 2
    Directions
  • Jakob-Bleyer-Straße 1, 70839 Gerlingen
    SWS22 kW4 pointsType 2
    Directions
  • Dieselstr. 2, 70839 Gerlingen
    EGT Energy Solutions GmbH22 kW4 pointsType 224/7
    Directions
  • Dieselstraße 2, 70839 Gerlingen
    SCHARR Drive Ladestation11 kW4 pointsType 2
    Directions
  • Hauptstr. 54, 70839 Gerlingen
    SWS11 kW4 pointsType 224/7
    Directions
  • Panoramastr. 1, 70839 Gerlingen
    SWS22 kW2 pointsType 224/7
    Directions
  • Urbanstr. 3, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Fürsaalstr. 4, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Zedernweg 9, 70839 Gerlingen
    SWS22 kW2 pointsType 2
    Directions
  • Vesouler Str. 25, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Karlsbader Str. 36, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Hofwiesenstr. 38, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Obere Ringstr. 43, 70839 Gerlingen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Füllerstraße 23, 70839 Gerlingen
    Kiwon Park11 kW1 pointsType 2
    Directions

Recently opened

  • 16 Apr 2026 · Robert-Bosch-Platz 1 · 250 kW · Robert Bosch GmbH
  • 22 Oct 2025 · Panoramastr. 1 · 22 kW · SWS
  • 28 Mar 2025 · Hauptstr. 54 · 11 kW · SWS
  • 28 May 2024 · Dieselstraße 2 · 11 kW · SCHARR Drive Ladestation
  • 28 Feb 2024 · Zedernweg 9 · 22 kW · SWS

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out