Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ludwigsburg · Baden-Württemberg · Germany

EV charging stations in Murr

23 public charging sites with 33 charge points are registered in Murr, including 22 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Tesla Germany GmbH with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points33
DC fast points22
150 kW and up22

Charge points by power

≤ 11 kW0
12–22 kW10
23–49 kW0
50–149 kW0
≥ 150 kW23

Operators

Tesla Germany GmbH12
Aral Pulse8
Dieter Teifl4
ALDI SÜD3
deer GmbH2
SWLB Mobilität GmbH2
Autohaus Eberhardt2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Im langen Feld 17, 71711 Murr
    Aral Pulse300 kW8 pointsCCS, CHAdeMO
    Directions
  • Gottlieb-Daimler-Str. 37, 71711 Murr
    Tesla Germany GmbH250 kW12 pointsCCS24/7
    Directions
  • Im langen Feld 7/1, 71711 Murr
    ALDI SÜD150 kW3 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Mühlgasse 1, 71711 Murr
    deer GmbH22 kW2 pointsType 2
    Directions
  • Gottlieb-Daimler-Straße 41, 71711 Murr
    Dieter Teifl22 kW2 pointsType 2
    Directions
  • Gottlieb Daimler Straße 43, 71711 Murr
    Dieter Teifl22 kW2 pointsType 2
    Directions
  • Gottlieb-Daimler-Str. 43, 71711 Murr
    SWLB Mobilität GmbH22 kW2 pointsType 224/7
    Directions
  • Im Langen Feld 11, 71711 Murr
    Autohaus Eberhardt22 kW2 pointsType 2
    Directions

Recently opened

  • 25 Jun 2024 · Im langen Feld 17 · 300 kW · Aral Pulse
  • 20 Jun 2023 · Im Langen Feld 11 · 22 kW · Autohaus Eberhardt
  • 20 Apr 2023 · Gottlieb-Daimler-Str. 37 · 250 kW · Tesla Germany GmbH
  • 7 Mar 2022 · Im langen Feld 7/1 · 150 kW · ALDI SÜD
  • 4 Aug 2021 · Mühlgasse 1 · 22 kW · deer GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET