Day-ahead today15:55€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ludwigsburg · Baden-Württemberg · Germany

EV charging stations in Sachsenheim

18 public charging sites with 37 charge points are registered in Sachsenheim, including 6 DC fast-charging points. The most powerful points deliver up to 75 kW.

The largest operator is amba operations with 16 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points37
DC fast points6
150 kW and up0

Charge points by power

≤ 11 kW5
12–22 kW24
23–49 kW0
50–149 kW8
≥ 150 kW0

Operators

amba operations16
deer GmbH6
EnBW mobility+ AG und Co.KG4
ALDI SÜD4
Schulstiftung der Evangelischen Landeskirche in Württemberg Evangelische Seminarstiftunginfo@schulstiftung.info4
E.ON Drive GmbH2
LEV Veranstaltungstechnik1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Ludwigsburger Straße 40, 74343 Sachsenheim
    EnBW mobility+ AG und Co.KG75 kW2 pointsCCS24/7
    Directions
  • Südring 1, 74343 Sachsenheim
    ALDI SÜD50 kW2 pointsCCS
    Directions
  • Industriestr. 4, 74343 Sachsenheim
    E.ON Drive GmbH50 kW2 pointsCCS, Type 2
    Directions
  • Ludwigsburger Str. 40, 74343 Sachsenheim
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Breuningerstr. 1, 74343 Sachsenheim
    amba operations22 kW12 pointsType 2
    Directions
  • Ludwigsburger Str. 34, 74343 Sachsenheim
    amba operations22 kW4 pointsType 2
    Directions
  • Ludwigsburger Str. 34, 74343 Sachsenheim
    Schulstiftung der Evangelischen Landeskirche in Württemberg Evangelische Seminarstiftunginfo@schulstiftung.info11 kW4 pointsType 2
    Directions
  • Zwischen den Wegen 2, 74343 Sachsenheim
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Kelterplatz 11, 74343 Sachsenheim
    deer GmbH22 kW2 pointsType 224/7
    Directions
  • Bahnhofstraße 14, 74343 Sachsenheim
    deer GmbH22 kW2 pointsType 2
    Directions
  • Spielberger Str. 15, 74343 Sachsenheim
    deer GmbH22 kW2 pointsType 224/7
    Directions
  • Industriestrasse 20/1, 74343 Sachsenheim
    LEV Veranstaltungstechnik11 kW1 pointsType 2
    Directions

Recently opened

  • 1 Apr 2026 · Südring 1 · 50 kW · ALDI SÜD
  • 24 Mar 2026 · Kelterplatz 11 · 22 kW · deer GmbH
  • 5 Feb 2026 · Spielberger Str. 15 · 22 kW · deer GmbH
  • 13 Oct 2025 · Breuningerstr. 1 · 22 kW · amba operations
  • 13 Oct 2025 · Ludwigsburger Str. 34 · 22 kW · amba operations

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out