Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Sigmaringen · Baden-Württemberg · Germany

EV charging stations in Sigmaringen

20 public charging sites with 38 charge points are registered in Sigmaringen, including 12 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Sigmaringen GmbH with 16 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites20
Charge points38
DC fast points12
150 kW and up12

Charge points by power

≤ 11 kW7
12–22 kW18
23–49 kW0
50–149 kW0
≥ 150 kW13

Operators

Stadtwerke Sigmaringen GmbH16
EnBW mobility+ AG und Co.KG9
EnBW ODR AG2
Arthur Demmer CNC Bearbeitung e.K.2
Bayer Immobilien Verwaltung KG2
ws IT Service GmbH2
E-Ladestation Wachtelhau2
Andreas Busch2
Parkraumgesellschaft Baden-Württemberg GmbH1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • In der Au 2/3, 72488 Sigmaringen
    EnBW mobility+ AG und Co.KG300 kW5 pointsCCS, Type 2
    Directions
  • Friedrich-List-Str. 3, 72488 Sigmaringen
    EnBW mobility+ AG und Co.KG200 kW4 pointsCCS24/7
    Directions
  • Friedrich-List-Straße 8, 72488 Sigmaringen
    EnBW ODR AG150 kW2 pointsCCS
    Directions
  • Friedrich-List-Straße 8, 72488 Sigmaringen
    Arthur Demmer CNC Bearbeitung e.K.150 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Marie-Curie-Straße 20, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW4 pointsType 2
    Directions
  • Marie-Curie-Straße 8, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW4 pointsType 2
    Directions
  • Leopoldstraße 4, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW2 pointsType 2
    Directions
  • In den Burgwiesen 18, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW2 pointsType 2
    Directions
  • Hohenzollernstraße 40, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW2 pointsType 2
    Directions
  • Bahnhofstraße 2-22, 72488 Sigmaringen
    Stadtwerke Sigmaringen GmbH22 kW2 pointsType 2
    Directions
  • Marie-Curie-Str. 18, 72488 Sigmaringen
    Bayer Immobilien Verwaltung KG22 kW2 pointsType 224/7
    Directions
  • Wachtelhau 10, 72488 Sigmaringen
    ws IT Service GmbH11 kW2 pointsType 2
    Directions
  • Maximilian-Haller-Straße 16/2, 72488 Sigmaringen
    E-Ladestation Wachtelhau11 kW2 pointsType 2
    Directions
  • Konviktstr. 11, 72488 Sigmaringen
    Andreas Busch11 kW2 pointsType 224/7
    Directions
  • Anton-Günther-Str. 51, 72488 Sigmaringen
    Parkraumgesellschaft Baden-Württemberg GmbH11 kW1 pointsType 224/7
    Directions

Recently opened

  • 4 May 2026 · Friedrich-List-Str. 3 · 200 kW · EnBW mobility+ AG und Co.KG
  • 7 Feb 2025 · In der Au 2/3 · 300 kW · EnBW mobility+ AG und Co.KG
  • 20 Nov 2024 · Anton-Günther-Str. 51 · 11 kW · Parkraumgesellschaft Baden-Württemberg GmbH
  • 19 Aug 2024 · Marie-Curie-Str. 18 · 22 kW · Bayer Immobilien Verwaltung KG
  • 1 Nov 2023 · Maximilian-Haller-Straße 16/2 · 11 kW · E-Ladestation Wachtelhau

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out