EV charging stations in Ludwigsfelde
36 public charging sites with 69 charge points are registered in Ludwigsfelde, including 24 DC fast-charging points and 19 delivering at least 150 kW. The most powerful points deliver up to 320 kW.
The largest operator is Pfalzwerke AG with 10 charge points; 17 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Parkallee 36, 14974 LudwigsfeldeDirections
- Rousseauallee 22, 14974 LudwigsfeldeDirections
- Parkallee 2, 14974 LudwigsfeldeDirections
- Parkallee 1, 14974 LudwigsfeldeDirections
- Bruno-Taut-Straße 2, 14974 LudwigsfeldeDirections
- Zossener Landstr. 12, 14974 LudwigsfeldeDirections
- Seestraße 6, 14974 LudwigsfeldeDirections
Other charging sites
AC charge points, sorted by number of points.
- Dr.-Ernst-Zimmermann-Str. 2, 14974 LudwigsfeldeDirections
- Lindenweg 1, 14974 LudwigsfeldeDirections
- Potsdamer Straße 84, 14974 LudwigsfeldeDirections
- Alt-Löwenbruch 57, 14974 LudwigsfeldeDirections
- Seestr. 7, 14974 LudwigsfeldeDirections
- Am Bahnhof 0, 14974 LudwigsfeldeDirections
- Bahnhaltepunkt Stuveshof 0, 14974 LudwigsfeldeDirections
- Rathausstraße 1, 14974 LudwigsfeldeDirections
- Albert-Schweitzer Straße 40-44, 14974 LudwigsfeldeDirections
- Genshagener Dorfstr. 8, 14974 LudwigsfeldeDirections
- Märkisch Wilmersdorfer Weg 9, 14974 LudwigsfeldeDirections
- Waldkauzweg 17, 14974 LudwigsfeldeDirections
- Loiretalring 37, 14974 LudwigsfeldeDirections
Recently opened
- 23 Jun 2026 · Parkallee 2 · 300 kW · EWE Go GmbH
- 10 Mar 2026 · Seestr. 7 · 22 kW · Citywatt GmbH
- 26 Sept 2025 · Lindenweg 1 · 11 kW · Wirelane GmbH
- 24 Jul 2025 · Märkisch Wilmersdorfer Weg 9 · 11 kW · Ina Gottlick
- 15 Jan 2025 · Parkallee 36 · 320 kW · Pfalzwerke AG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Blankenfelde-Mahlow 76
- Zossen 51
- Teltow 49
- Kleinmachnow 62
- Michendorf 33
- Potsdam 284
- Schönefeld 146
- Wildau 68
- Berlin 7,544
- Königs Wusterhausen 33
- Beelitz 35
- Werder (Havel) 45
Data: official national charge point register (1 September 2026). Data sources