Landkreis Tirschenreuth · Bayern · Germany

EV charging stations in Tirschenreuth

21 public charging sites with 36 charge points are registered in Tirschenreuth, including 6 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is Energielösung GmbH with 16 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points36
DC fast points6
150 kW and up2

Charge points by power

≤ 11 kW8
12–22 kW18
23–49 kW0
50–149 kW6
≥ 150 kW4

Operators

Energielösung GmbH16
Qwello Deutschland GmbH6
E-Center Legat4
N-ERGIE Aktiengesellschaft4
Autohaus W. Hager und Sohn GmbH2
W. Hager & Sohn GmbH2
Pack mas2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hammstrasse 1, 95643 Tirschenreuth
    Energielösung GmbH150 kW4 pointsCCS, Type 2
    Directions
  • Mitterteicher Str. 20, 95643 Tirschenreuth
    E-Center Legat50 kW4 pointsCCS, Type 224/7
    Directions
  • Einsteinstraße 13, 95643 Tirschenreuth
    Energielösung GmbH50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Einsteinstraße 2, 05643 Tirschenreuth
    Energielösung GmbH22 kW10 pointsType 2
    Directions
  • Mähringer Straße 9, 95643 Tirschenreuth
    Qwello Deutschland GmbH11 kW6 pointsType 224/7
    Directions
  • St. Peter Straße 0, 95643 Tirschenreuth
    N-ERGIE Aktiengesellschaft22 kW2 pointsType 2
    Directions
  • Mühlbühlstraße 0, 95643 Tirschenreuth
    N-ERGIE Aktiengesellschaft22 kW2 pointsType 2
    Directions
  • Mitterteicher Strasse 33, 95643 Tirschenreuth
    Autohaus W. Hager und Sohn GmbH22 kW2 pointsType 2
    Directions
  • Mitterteicher Straße 33, 95643 Tirschenreuth
    W. Hager & Sohn GmbH22 kW2 pointsType 2
    Directions
  • Schillerweg 5, 95643 Tirschenreuth
    Pack mas11 kW2 pointsType 2
    Directions

Recently opened

  • 15 Jul 2025 · Mitterteicher Str. 20 · 50 kW · E-Center Legat
  • 18 Dec 2023 · Mähringer Straße 9 · 11 kW · Qwello Deutschland GmbH
  • 7 Oct 2022 · Hammstrasse 1 · 150 kW · Energielösung GmbH
  • 7 Oct 2022 · Einsteinstraße 13 · 50 kW · Energielösung GmbH
  • 7 Oct 2022 · Einsteinstraße 2 · 22 kW · Energielösung GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources