EV charging stations in Windischeschenbach
28 public charging sites with 40 charge points are registered in Windischeschenbach, including 37 DC fast-charging points and 26 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Allego with 12 charge points; 5 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Gewerbepark 2A, 92670 WindischeschenbachDirections
- Am Gewerbepark 2, 92670 WindischeschenbachDirections
- Waldnaabtal Ost UFC 4 0, 92670 WindischeschenbachDirections
- Waldnaabtal Ost UFC 2 0, 92670 WindischeschenbachDirections
- Waldnaabtal West UFC 4 0, 92670 WindischeschenbachDirections
- Waldnaabtal West UFC 2 0, 92670 WindischeschenbachDirections
- Waldnaabtal West UFC 3 0, 92670 WindischeschenbachDirections
- Waldnaabtal Ost UFC 3 0, 92670 WindischeschenbachDirections
- Waldnaabtal Ost UFC 1 0, 92670 WindischeschenbachDirections
- Waldnaabtal West UFC 1 0, 92670 WindischeschenbachDirections
- Raststätte Waldnaabtal Ost 0, 92670 WindischeschenbachDirections
- Raststätte Waldnaabtal West 0, 92670 WindischeschenbachDirections
- Raststätte Waldnaabtal West 0, 92670 WindischeschenbachDirections
- Raststätte Waldnaabtal Ost 0, 92670 WindischeschenbachDirections
- Waldnaabtal West 0, 92670 WindischeschenbachDirections
- Waldnaabtal Ost 0, 92670 WindischeschenbachDirections
Recently opened
- 7 Aug 2025 · Raststätte Waldnaabtal Ost 0 · 100 kW · E.ON Drive Infrastructure
- 7 Aug 2025 · Raststätte Waldnaabtal West 0 · 100 kW · E.ON Drive Infrastructure
- 15 May 2025 · Am Gewerbepark 2 · 250 kW · Tesla Germany GmbH
- 14 May 2024 · Am Gewerbepark 2A · 400 kW · Allego
- 22 Jun 2021 · Waldnaabtal Ost UFC 4 0 · 175 kW · E.ON Drive Infrastructure
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Vohenstrauß 25
- Tirschenreuth 36
- Mitterteich 46
- Weiden i.d.OPf. 53
- Weiden 41
- Marktredwitz 35
- Wunsiedel 38
- Wernberg-Köblitz 51
- Selb 39
- Bindlach 33
- Bayreuth 262
- Pegnitz 28
Data: official national charge point register (1 September 2026). Data sources