Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Neustadt a.d. Waldnaab · Bayern · Germany

EV charging stations in Windischeschenbach

28 public charging sites with 40 charge points are registered in Windischeschenbach, including 37 DC fast-charging points and 26 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Allego with 12 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites28
Charge points40
DC fast points37
150 kW and up26

Charge points by power

≤ 11 kW0
12–22 kW0
23–49 kW0
50–149 kW12
≥ 150 kW28

Operators

Allego12
E.ON Drive Infrastructure12
Tesla Germany GmbH8
EnBW mobility+ AG und Co.KG4
E.ON Drive GmbH4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Am Gewerbepark 2A, 92670 Windischeschenbach
    Allego400 kW12 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Am Gewerbepark 2, 92670 Windischeschenbach
    Tesla Germany GmbH250 kW8 pointsCCS24/7
    Directions
  • Waldnaabtal Ost UFC 4 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal Ost UFC 2 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal West UFC 4 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal West UFC 2 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal West UFC 3 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal Ost UFC 3 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal Ost UFC 1 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Waldnaabtal West UFC 1 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure175 kW1 pointsCCS, CHAdeMO
    Directions
  • Raststätte Waldnaabtal Ost 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure100 kW2 pointsCCS24/7
    Directions
  • Raststätte Waldnaabtal West 0, 92670 Windischeschenbach
    E.ON Drive Infrastructure100 kW2 pointsCCS24/7
    Directions
  • Raststätte Waldnaabtal West 0, 92670 Windischeschenbach
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Raststätte Waldnaabtal Ost 0, 92670 Windischeschenbach
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Waldnaabtal West 0, 92670 Windischeschenbach
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Waldnaabtal Ost 0, 92670 Windischeschenbach
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Recently opened

  • 7 Aug 2025 · Raststätte Waldnaabtal Ost 0 · 100 kW · E.ON Drive Infrastructure
  • 7 Aug 2025 · Raststätte Waldnaabtal West 0 · 100 kW · E.ON Drive Infrastructure
  • 15 May 2025 · Am Gewerbepark 2 · 250 kW · Tesla Germany GmbH
  • 14 May 2024 · Am Gewerbepark 2A · 400 kW · Allego
  • 22 Jun 2021 · Waldnaabtal Ost UFC 4 0 · 175 kW · E.ON Drive Infrastructure

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET