Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Leer · Niedersachsen · Germany

EV charging stations in Weener

13 public charging sites with 27 charge points are registered in Weener, including 15 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Backcharge with 10 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites13
Charge points27
DC fast points15
150 kW and up14

Charge points by power

≤ 11 kW0
12–22 kW12
23–49 kW0
50–149 kW0
≥ 150 kW15

Operators

Backcharge10
EnBW mobility+ AG und Co.KG5
EWE Go HOCHTIEF Ladepartner GmbH & Co. KG4
EWE Go GmbH4
Vattenfall Smarter Living GmbH2
H. Züchner GmbH & Co. KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • GewerbePark Rheiderland 7, 26826 Weener
    Backcharge400 kW4 pointsCCS24/7
    Directions
  • Boenster Str. 25, 26826 Weener
    EWE Go HOCHTIEF Ladepartner GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Neue Feldstraße 2, 26826 Weener
    EnBW mobility+ AG und Co.KG300 kW5 pointsCCS, Type 2
    Directions
  • Kirchhofstr. 3, 26826 Weener
    Vattenfall Smarter Living GmbH180 kW2 pointsCCS24/7
    Directions
  • Rostocker Str. 18, 26826 Weener
    H. Züchner GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Osterstr. 1, 26826 Weener
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Schulstr. 16, 26826 Weener
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Dorfstr. 63, 26826 Weener
    Backcharge22 kW2 pointsType 224/7
    Directions
  • Weenerstr. 104
    Backcharge22 kW2 pointsType 224/7
    Directions
  • Poghörn 13 a-e, 26826 Weener
    Backcharge22 kW2 pointsType 2
    Directions

Recently opened

  • 10 Jun 2026 · Kirchhofstr. 3 · 180 kW · Vattenfall Smarter Living GmbH
  • 28 May 2026 · Weenerstr. 104 · 22 kW · Backcharge
  • 1 Apr 2026 · GewerbePark Rheiderland 7 · 400 kW · Backcharge
  • 6 Oct 2025 · Dorfstr. 63 · 22 kW · Backcharge
  • 24 Apr 2025 · Boenster Str. 25 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET