Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Bayern · Germany

EV charging stations in Weiden i.d.OPf.

28 public charging sites with 53 charge points are registered in Weiden i.d.OPf., including 22 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 320 kW.

The largest operator is Stadtwerke Weiden i.d.OPf. AöR with 12 charge points; 15 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites28
Charge points53
DC fast points22
150 kW and up16

Charge points by power

≤ 11 kW2
12–22 kW21
23–49 kW2
50–149 kW8
≥ 150 kW20

Operators

Stadtwerke Weiden i.d.OPf. AöR12
BayWa Mobility Solutions GmbH8
Autohaus Widmann GmbH & Co. KG6
Allego4
KREINER Energie- und Verwaltungs KG4
EnBW mobility+ AG und Co.KG2
Netto Marken-Discount Stiftung & Co. KG2
Lidl2
Kaufland2
ALDI SÜD2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Am Wörnzgraben 2, 92637 Weiden i.d.OPf.
    Autohaus Widmann GmbH & Co. KG320 kW6 pointsCCS, Type 2
    Directions
  • Dr.-Kilian-Str. 11, 92637 Weiden i.d.OPf.
    Allego300 kW4 pointsCCS
    Directions
  • Untere Bauscherstr. 21, 92637 Weiden i.d.OPf.
    BayWa Mobility Solutions GmbH200 kW8 pointsCCS24/7
    Directions
  • Robert-Bosch-Str. 3, 92637 Weiden i.d.OPf.
    EnBW mobility+ AG und Co.KG150 kW2 pointsCCS
    Directions
  • Robert-Bosch-Str. 2, 92637 Weiden i.d.OPf.
    Netto Marken-Discount Stiftung & Co. KG50 kW2 pointsCCS, Type 224/7
    Directions
  • Zur Centralwerkstätte 22, 92637 Weiden i.d.OPf.
    Lidl50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Untere Bauscherstr. 25, 92637 Weiden i.d.OPf.
    Kaufland50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Neustädter Str. 47, 92637 Weiden i.d.OPf.
    ALDI SÜD50 kW2 pointsCCS
    Directions
  • Obere Bauscherstr. 14, 92637 Weiden i.d.OPf.
    Comfort Charge49 kW2 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Leibnizstraße 20, 92637 Weiden i.d.OPf.
    Stadtwerke Weiden i.d.OPf. AöR22 kW4 pointsType 2
    Directions
  • Regensburger Str. 95, 92637 Weiden i.d.OPf.
    KREINER Energie- und Verwaltungs KG22 kW4 pointsType 224/7
    Directions
  • Raiffeisenstr. 5, 92637 Weiden i.d.OPf.
    Stadtwerke Weiden i.d.OPf. AöR22 kW2 pointsType 2
    Directions
  • Dr.-Pfleger-Str. 15, 92637 Weiden i.d.OPf.
    Stadtwerke Weiden i.d.OPf. AöR22 kW2 pointsType 2
    Directions
  • Moosbürger Str. 15, 92637 Weiden i.d.OPf.
    Energielösung GmbH22 kW2 pointsType 224/7
    Directions
  • Gaswerkstr. 20, 92637 Weiden i.d.OPf.
    Stadtwerke Weiden i.d.OPf. AöR22 kW2 pointsType 2
    Directions
  • Bürgermeister-Prechtl-Straße 26, 92637 Weiden i.d.OPf.
    Stadtwerke Weiden i.d.OPf. AöR22 kW2 pointsType 2
    Directions
  • Schustermooslohe 52, 92637 Weiden i.d.OPf.
    Konstantin Lasunov22 kW2 pointsType 224/7
    Directions
  • Dr.-Kilian-Str. 1a, 92637 Weiden i.d.OPf.
    Richter+Frenzel GmbH + Co. KG22 kW1 pointsType 224/7
    Directions
  • Hagedornweg 33, 92637 Weiden i.d.OPf.
    Dohn Verwaltung11 kW1 pointsType 224/7
    Directions
  • Hagedornweg 35, 92637 Weiden i.d.OPf.
    Dohn Verwaltung11 kW1 pointsType 224/7
    Directions

Recently opened

  • 7 Jul 2026 · Robert-Bosch-Str. 3 · 150 kW · EnBW mobility+ AG und Co.KG
  • 9 Mar 2026 · Regensburger Str. 95 · 22 kW · KREINER Energie- und Verwaltungs KG
  • 16 Feb 2026 · Neustädter Str. 47 · 50 kW · ALDI SÜD
  • 1 Oct 2025 · Am Wörnzgraben 2 · 320 kW · Autohaus Widmann GmbH & Co. KG
  • 11 Jun 2025 · Moosbürger Str. 15 · 22 kW · Energielösung GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET