EV charging stations in Weiden i.d.OPf.
28 public charging sites with 53 charge points are registered in Weiden i.d.OPf., including 22 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 320 kW.
The largest operator is Stadtwerke Weiden i.d.OPf. AöR with 12 charge points; 15 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Wörnzgraben 2, 92637 Weiden i.d.OPf.Directions
- Dr.-Kilian-Str. 11, 92637 Weiden i.d.OPf.Directions
- Untere Bauscherstr. 21, 92637 Weiden i.d.OPf.Directions
- Robert-Bosch-Str. 3, 92637 Weiden i.d.OPf.Directions
- Robert-Bosch-Str. 2, 92637 Weiden i.d.OPf.Directions
- Zur Centralwerkstätte 22, 92637 Weiden i.d.OPf.Directions
- Untere Bauscherstr. 25, 92637 Weiden i.d.OPf.Directions
- Neustädter Str. 47, 92637 Weiden i.d.OPf.Directions
- Obere Bauscherstr. 14, 92637 Weiden i.d.OPf.Directions
Other charging sites
AC charge points, sorted by number of points.
- Leibnizstraße 20, 92637 Weiden i.d.OPf.Directions
- Regensburger Str. 95, 92637 Weiden i.d.OPf.Directions
- Raiffeisenstr. 5, 92637 Weiden i.d.OPf.Directions
- Dr.-Pfleger-Str. 15, 92637 Weiden i.d.OPf.Directions
- Moosbürger Str. 15, 92637 Weiden i.d.OPf.Directions
- Gaswerkstr. 20, 92637 Weiden i.d.OPf.Directions
- Bürgermeister-Prechtl-Straße 26, 92637 Weiden i.d.OPf.Directions
- Schustermooslohe 52, 92637 Weiden i.d.OPf.Directions
- Dr.-Kilian-Str. 1a, 92637 Weiden i.d.OPf.Directions
- Hagedornweg 33, 92637 Weiden i.d.OPf.Directions
- Hagedornweg 35, 92637 Weiden i.d.OPf.Directions
Recently opened
- 7 Jul 2026 · Robert-Bosch-Str. 3 · 150 kW · EnBW mobility+ AG und Co.KG
- 9 Mar 2026 · Regensburger Str. 95 · 22 kW · KREINER Energie- und Verwaltungs KG
- 16 Feb 2026 · Neustädter Str. 47 · 50 kW · ALDI SÜD
- 1 Oct 2025 · Am Wörnzgraben 2 · 320 kW · Autohaus Widmann GmbH & Co. KG
- 11 Jun 2025 · Moosbürger Str. 15 · 22 kW · Energielösung GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
Data: official national charge point register (1 September 2026). Data sources